Building project 3 – Day 7

Day 7 and the early starts and consultations are starting to take their toll.

Today I had to dash to the store to get some more legs for the cabinets (Ikea had figured a different configuration than the installer, so there weren’t quite enough), then immediately dash to my exercise class (the hardest of my week). There were then multiple consultations during the day (the external tap had to be moved, various plans with fillers and requiring extra plinth) the final one being that the worktop was going to be too short. This was traced to a very wide filler being used between the corner unit and the washing machine (which wasn’t on the plan), so everything can be moved back up and the worktop will fit as intended.

Kitchen Day 7 - Aspect 3Kitchen Day 7 - Aspect 4