It doesn’t look like much happened on day 8, but it was lots of finishing off. The cabinets on the right hand side got moved into their final positions. The plinths were all fitted and the floor re-tiled where things had been moved around. The plaster was also repaired and all of the old kitchen taken away.
Tomorrow should be the end with the worktops arriving allowing the sink and hob to be fitted and all the plumbing finished off.