The start of week three saw everything move to the front of the house and the collapsing front wall was rebuilt. It still needs its topping of engineering bricks, hence it’s shroud, but then it will be on to paving. The skip has attracted attention from a neighbour, it was one of the different ways to get to know a neighbour (at least they asked if they could use it rather than dump stuff in there in the dead of night).
Building project 4 – Day 11
Leave a reply