Day 9 and the back garden is closing in on completion. The patio has been laid (but needs pointing tomorrow), and the lawn area has been levelled and raked ready for the turf to be laid tomorrow. The old skip has also been taken away and replaced with a smaller version.
Building project – Day 9
Leave a reply