Tag Archives: ravelry

Taking control

With so much of my life up in the air (how long will I be working here, when will I be moving) I have decided to take control of something: my knitting. I’ve checked out my current projects and those queued and come up with what is hopefully a realistic list of things to get done by the end of the year. I’ve gone through and tagged queued items with “2008” or “2009” and those falling within 2008 all have anticipated completion dates to try and keep me motivated.

With the socks it’s pretty easy to work out how long they should take, but I’ve also got 5 large projects (4 shawls and 1 blanket) which could swim along quickly and easily, or drag significantly. Still, it’s a target of 14 items in just over 4 months. What could possibly go wrong?